Database synchronisation should take place automatically once the Internet connection has been set up (see section Internet Connectivity). If you have decided to work without an Internet connection, the database synchronisation will not take place and you can skip over this section.
The database synchronisation has four different statuses:
Colour |
Description |
Action required |
---|---|---|
Black |
No connection has been established with the Visit and Poken by GES database. |
Check Internet connectivity (see section Internet Connectivity) |
Orange |
The EventBox is trying to establish a connection to the Visit and Poken by GES database. |
Monitor to see what colour it changes to |
Red |
There is currently no connection to the Visit and Poken by GES database. There has been a connection however and data was updated at that time. |
Check Internet connectivity (see section Internet Connectivity) |
Green |
A connection is in place. Synchronisation has taken place. Updates will take place in real-time |
None |
Table 4‑3 EventBox synchronisation statuses
Comments
0 comments
Please sign in to leave a comment.